Canary Wharf Station
The works involved the upgrading and modification of the existing station services, including installation of secure door systems to both Canary Wharf and North Greenwich stations. In addition, the...
West Ham Station
The modernisation of the District Line Platforms at West Ham Station included civil engineering works, building works, mechanical and electrical works and the installation of a new communication...
Ladbroke Grove Station
The works to the listed station involved embankment and platform stabilisation including underpinning, continuous piled walls, concrete capping beam, installation of tie rods spanning under the rails...
Project Management - Extended Arm Contract
West Ham Station
The scheme involved installation of a MIP Lift along with additional improvements to station ambience, including improved signage, station seating, hand railing to lift lobby roof and lift lobby...
Lillie Bridge Depot Retaining Wall
The project involved the design and construction of a retaining wall at the depot where a small land slip had occurred, endangering the access road. Also involved were modifications to the roads and...
ES30 Bridge Concrete Repairs
The project included concrete repairs to a Highway Agency bridge carrying the four lane A40 over the Central Line in West London. The project included the provision of a temporary crash deck over...
Lineside Fencing
The contract was for the installation of replacement lineside fencing along sections of the Metropolitan Line from Harrow out to the limits of the line. Over 4km of fence were erected. This was a...
Walthamstow Station Ticket Hall
The provision of new staff accommodation at ticket hall level included re-situating the fire sprinkler control systems to another floor.
Swiss Cottage Station Refurbishment
The ticket hall area was refurbished using 1930’s style tiling on both walls and floors. The scheme also included the installation of a water management system to deal with water ingress through the...
Adelaide Road Fan
The project involved the provision of a new 4m-diameter fan unit in the vent shaft at Adelaide Road on the Jubilee Line to replace the existing life expired unit.
The project also included...
Switchboard Renewal
Work was undertaken at Blackhorse Road, Highbury & Islington and Walthamstow stations to renew the life expired switchboards.
Euston Square Station Refurbishment
The project included the reconstruction of both platforms including nosing tiles and new non-slip tiled surfaces. The ticket hall floor was also re-tiled as part of the project.
Neasden Depot Train Washshed
The original floor within the depot had been eroded by the carriage cleaning chemicals.
The project involved the replacement of the flooring with an epoxy coating. The floor replaced was...
Moorgate Station Refurbishment
The project involved general station ambience improvements including floor and wall re-tiling in the ticket hall. The project also included water ingress leak sealing at specific locations.
Great Portland Street Station Refurbishment
The scheme involved the reconstruction of both platforms including nosing tiles, tactile strip and new non-slip tiled surfaces.
The exposed brickwork, a feature of this station, was restored...
Water Services
The project involved carrying out inspections to the water supply systems at 31 stations and 2 depots, and subsequent work to ensure that supplies complied with current legislation.
Stanmore Station Forecourt
The scheme involved carrying out feasability studies and design/remodelling of the station forecourt area for use by the public and London Transport buses.
Project Management - Project Delivery Partnership
East Ham Station Refurbishment
The project involved the full reconstruction of the platforms, refurbishment of the station accommodation, installation of a MIP lift, replacement of stairs and provision of new lighting plus general...
Victoria Platforms
The project involved carrying out exploratory works to the District Line Platforms. Based upon these exploratory works, access points were constructed, spoil removed from below the platforms and...
Connect Project Enabling Works
The project involved the design and construction of enabling works associated with the provision of the Connect project being undertaken by Citylink on behalf of London Underground. This work...
Train Staff Accommodation
The project was split into two phases.
Phase one involved the development of scheme options, designs and construction of new train staff accommodation at Seven Sisters and refurbishment of...
Upton Park Station Refurbishment
The project involved carrying out external works to the station entrance, refurbishment of the ticket hall including floor tiling and new lighting, renewal of both Eastbound and Westbound platform...
Warren Street Station Refurbishment
The project involved refurbishment of the station exterior, which included the renewal of the ceiling and all wall finishes, and a new electronic customer information display was installed in the...
Pinner Station
The scheme involved the design and installation of a footbridge plus associated works to enable a sub-standard subway to be withdrawn from service and decommissioned.
Camden Town
The project involved the refurbishment of all public areas. The work involved re-tiling, painting and cleaning the platforms and cross passages, as well as repair and renewal of expired assets...
Wembley Park Shed
The project involved the removal of the existing asbestos roofing to the shed and replacing it with a new steel substitute. Renovation to the accommodation, along with trackwork replacement, also...
Neasden Depot Track Walkways
The scheme involved the installation of new walkways at nine locations across the depot tracks with the associated ramping of the power rails either side of the walkway and installation of...
Seven Sisters Train Crew Accommodation
The project involved the construction of a new 3-storey train staff accommodation block. The lower level provides secure parking for staff and the upper two floors comprise locker rooms, showers,...
Construction Management
Elephant and Castle Station
Birse Metro have experience of delivery in the underground environment as Construction Managers. Infraco BCV Ltd developed the construction management strategy for the Northern Line Ticket office at...
Management Contracting
General Contract
A number of packages have been given to Birse Metro to manage under ECC Option F, from design development through to commissioning and handover. These packages are spread across various Jubilee Line...
Professional Services
BCV Station Modernisation
Birse Metro provided a professional services function to aid the design of BCV Station Modernisation project. Project management staff with expertise in the delivery of major projects worked in...
Connect Project Enabling Works
Birse Metro provided key personnel for the JNP delivery team to assist in the planning and implementation of the Connect Project enabling works.
Design
Fluor Design Connect Enabling Works
Birse Metro acted as Project Managers on behalf of Fluor Ltd to deliver BCV Connect Enabling designs. Works involve detailed route surveys, hazardous materials sampling and the preparation of design...
Remedial Bridge Design
The design and preparation of repair options for six bridge structures on the Jubilee Line. This included carrying out value management exercises with the client to arrive at the optimum solutions.
Extended Arm Contract
The portfolio of work included over 50 schemes ranging in value from £50k to £170m. Most of the schemes involved Birse Metro developing designs from feasibility stage through outline and detail...